IT WILL BE HERE SOON! PERMITS ARE IN PLACE AND THE CONCRETE PAD WAS POURED! CHECK BACK
FOR PICTURES. MEANWHILE THIS IS WHAT IT WILL LOOK LIKE (KINDA).
THE CONCRETE FOUNDATION HAS BEEN POURED. SEE THE PICTURES BELOW.
A REBAR GRID WAS ASSEMBLED IN THE HOLE
FORMS WERE PLACED AROUND THE GRID
FOUR FOOTING WERE ADDED AND THE CONCRETE WAS ALLOWED TO HARDEN

The dirt was backfilled over the foundation so that only the 4 attachments for the tower's feet are evident. The
control panel was installed beside the concrete foot pads.

The electricity lines have been hooked up to the control panel. Now we just need the tower and turbine!!
|